 Phase I – built in 1915 as the original County High School .  Upgrades:  New roof – 2005; Wall removal and open post and beam on top floor;  Lathe and plaster removal – 40% complete; Window repairs and paint.   

Three levels:  First level – 4600 sq ft.; Second level – 4600 sq ft.; Third level – 3000 sq. ft.

 Phase II-A  -- Cafeteria built in 1925.  Upgrades:  Remodel for commercial kitchen for Senior and Community Center, including accessible bathrooms – 1999;  Remodel for Rosie’s Café--2005: Walk-in cooler, grill/fryer vent hoods w/fire suppression, cabinets, paint and general aesthetic improvements; exterior accessible ramp. 

One level – 3025 sq ft.

 Phase II-B -- Gymnasium also built in 1925 .

Upgrades: Painted ceiling and gym walls, stripped paint on hardwood floors, accessible ramp to gym floor, repaired windows. 

One level – 3830 sq. ft.

 Phase III – built in 1947 for expansion. Upgrades:  Remodel for office and retail space (1998-2005) —interior walls for smaller rooms; installed exterior doors for street access; lowered ceilings in offices;  paint and general aesthetic improvements. 

One l evel -- 7500 sq. ft.